200MW Gas Turbine Generating Units - Makkah & Madinah, Contract No. 1112
Discipline
Power
Client
SCECO Western Region
The project consists of preliminary design studies, preparation of Tender documents and Tender Evaluation. To increase the generating capacity of the existing plants by adding 200MW of Gas Turbine Generating Units. This entails the installation and commissioning of 4 Fas Turbine Generating Units, each having a site rating of 50MW, on turn-key basis along with the fuel and water systems. 2 x 50MW of these units will be installed at the existing Makkah Power Station and 2 x 50MW shall also be installed at the existing Airport Road Plant at Madinah.