Project Description :

Phase "A"

Preparation of feasibility study to dispose of the sediments existing in the reservoir and control shear quantity entering the reservoir annually. The work also includes Topographic and Hydrological Surveys of 1000 sq.km of Catchment Areas.  Setting up hydrometer station, inspection of instruments embedded in the body of the dam, soil classification and Geotechnical Investigation.

 

Phase "B"

Detail Design and Preparation of Tender Documents of Sediment traps and Nursery.

COMPLETION DATE:

1987

SERVICES :

       Feasibility Study

       Final Design

 

Salient Features

Existing WTP : 18

New WTP : 81

Wells locations : 552

 