IMPLEMENT RISK ASSESSMENT RECOMMENDATINS ON RT LAB OWS PLT 70, RT REFINERY
Service : Oil and Gas
Discipline : Detail Design
Client : Saudi Aramco
PROVIDE
ENGINEERING & DRAFTING SERVICES FOR THE PREPARATION OF DETAIL DESIGN
PACKAGE AS FOLLOWS: 1) REPLACE THE ONE
EXISTING PNEUMATIC LEVEL TRANSMITTER (BUBBLER TYPE), ONE PNEUMATIC LOCAL LEVEL INDICATOR & ASSOCIATED FOUR
(4) PNEUMATIC LEVEL SWITCHES WITHONE (1)
GUIDED WAVE RADAR (GWR) LEVEL TRANSMITTER AND ONE (1) LOCAL REMOTE
INDICATOR TO MAINTAIN THE SIMILAR SUMP PUMP CONTROL SYSTEM OPERATION
PHILOSOPHY. 2. INSTALL
NEW PRESSURE SWITCH AT THE DISCHARGE OF
EACH
OILY WATER SUMP PUMP (070-GM-101A & 101B) AND REVISE CONTROL
SYSTEM OPERATION PHILOSOPHY. 3.
RELOCATE EXISTING INSTRUMENT RACK AWAY FROM THE OILY WATER SUMP
AT SAFE DISTANCE (7.5 METERS). 4. INSTALL NEW C,BUSTIBLE
GAS/HYDROGEN SULFIDE DETECTION(IN AIR) SYSTEM.
5. DISCONNECT THE EXISTING INSTRUMENT/POWER CABLE/CONDUITS AT THE EXISTING INSTRUMENT RACK THAT IS LOCATED NEAR THE
EXISTING OILY WATER SUMP AND AFTER THAT RE-ROUTE THE SAME INSTRUMENT RACK AT NEW PROPOSED SAFE
LOCATION.