Involves gas conversion works from crude oil to natural gas for twenty two (22) gas turbines for PP7 and thirty (30) gas turbines for PP8, each having a capacity of 50 MW, including the turbine modification works as well as installation of gas treatment plants. The Scope of services included design review, supervision of construction, testing and commissioning.
The project also includes involves project management, design review and construction supervision of 4 x 140 MW Gas Turbine Units.

